Permitting
Permitting
We build to the written requirements your county health department gives you, and we supply the drawings and plumbing diagram you hand in with your application. The research, the application and the follow ups stay with you, because the inspector who signs off is yours, not ours.
Read this first
What we are, and are not
We are cart builders. We are not permitting consultants, health code specialists or regulatory advisers. Health department rules are set by your county, sometimes by your city or state, and they differ widely, so your first call is to them, not to us.
What we provide
- Dimensioned drawings of the cart, free of charge with your estimate
- A plumbing diagram showing the tanks, pump, heater and every sink
- A materials list for the surfaces and the plumbing parts
- Photos of the finished build, including the plumbing before the panels close it in
- Construction to the documented spec your county gave you
What we do not do
- Fill in or file your application
- Research your county's rules for you
- Speak to the inspector or the health department on your behalf
- Guarantee approval, because the decision belongs to your county
If any of these is the help you need, a permitting consultant or your county's own staff are the right people to ask.
The process
How a permitted build runs
Six steps, in this order. The county sits in the middle of it, which is why the paperwork happens before anything is cut.
-
Tell us you need a permitted build
Say so on your enquiry and name the county and state that will issue the permit. That one line changes how we lay the cart out, so it is worth saying early.
-
Gather your county's written requirements
Call or visit your county health department and ask for its mobile food unit requirements in writing. A document or a web page we can both read beats notes from a phone call. The checklist further down covers what to ask for.
-
A short permitting call with us
We go through the requirements together, line by line, and work out how each one lands in the cart: where the sinks go, how big the tanks need to be, what the countertop is made of. If something in the document is unclear, you take that question back to the county.
-
We send schematics and the plumbing diagram
You get dimensioned drawings of the cart and a diagram of the water system showing the tanks, the pump, the heater and every sink. Drawings are free of charge with your estimate. These are the pages many counties want attached to the application.
-
You submit to the county and get plan approval
You file the application with our drawings attached and answer whatever the reviewer comes back with. If they ask for a change to the cart, send it to us and we revise the drawings before anything is cut.
-
Production starts after approval
You can wait for plan approval before you approve the estimate and pay the deposit, which is not refundable once paid. Once the county has approved the plans and the deposit is in, the build goes on the schedule. The cart is built to the approved drawings, and you get photos of the finished plumbing to keep with your permit file for the inspection.
Before you call us
What to ask your county for
Ask for each of these in writing. The answers are the spec we build to, and one line next to each explains what it changes in the cart.
-
The mobile food unit or cart application form
It lists the attachments the reviewer expects, which tells us what the drawings have to show.
-
The required sink type and count
A handwash sink alone and a handwash sink plus a three compartment sink are two very different carts.
-
Fresh and waste tank minimums
Tank size sets the cabinet space, the weight and often the overall length of the cart.
-
NSF or equivalent part requirements
Some counties want listed sinks, faucets and fittings. We need to know before parts are ordered.
-
Countertop and surface materials
Wood that is fine for a market stall may not pass as a food contact surface. The rule decides the top and the sealant.
-
Water heater and temperature rules
A minimum hot water temperature decides the heater size and the power it needs.
-
Drainage and disposal rules
Indirect drains, air gaps and grey water handling all change the plumbing layout under the counter.
-
Electrical and generator rules
Shore power, a battery or a generator each need different wiring, outlets and ventilation.
-
Commissary requirements
If the cart has to be refilled and emptied at a licensed kitchen, the tanks need to be reachable and easy to carry.
-
The inspection process and fees
Knowing when the inspection happens and where the cart has to be for it shapes your timeline and ours.
Opens a draft in your mail app with the questions filled in. Add your own address to keep a copy, or send it to us with your county's answers.
In the workshop
Common county requests we build to
The items that come up most often in the requirements customers send us. Your county decides which of them apply to you, and in what size.
Handwash sink with hot and cold water
A dedicated sink for hands only, fed by the heater and the fresh tank, with soap and towels within reach.
Three compartment sink
Wash, rinse and sanitize bays sized to the largest item you will clean, with drainboards where the county asks for them.
Matched fresh and grey tanks
A grey tank sized from the fresh tank by your county's rule, commonly a little larger, both reachable for filling and emptying without tools.
Sealed and cleanable surfaces
Smooth, non absorbent tops and interiors that can be wiped down, with the material chosen to the county's wording.
Enclosed storage
Doors on the cabinets so cups, lids and dry goods sit behind a closed front rather than on an open shelf.
Splash guards
Raised guards between the sinks and the food prep or service area, built into the countertop.
None of this is a promise that your county asks for it, or that it will be enough on its own. The list your health department gives you is the one that counts.
Ready made carts
Permitted builds and the shop
The ready made carts in the shop are built to one listed spec and are not designed around any particular county. Some may suit a market or a private event where no permit is needed, but we do not describe any of them as permit ready.
A permitted build usually goes through the semi custom or custom path, where the sinks, tanks and surfaces are laid out to your county's document before the drawings are made.
Next step
Have your county's list? Let's build to it.
Start the enquiry with the health permit question already answered and attach what the county gave you. If you are still gathering it, ask us anything about how a requirement turns into a cart.